Organization
- Define the right organogram.
- Recruit with an effective methodology.
- Train at every level.
- Plan incentives.
Apparel factory set-up consultants
An engineered apparel factory has trained manpower, optimum technology, ideal infrastructure and rationally designed processes. BENCI designs and builds all four together, so the factory performs from the first production day.
Designed together
What goes wrong
For a 250 machine set-up, these mistakes mean a loss of
2.5 lakh pieces of production
and Rs. 2.5 crore in profits
every year.
Benchmarks
| Feature | Benchmark |
|---|---|
| Man-to-machine ratio | 2.0 or less |
| Operator efficiency | Up to 40% within 6 weeks of training |
| Floor space | About 20% saved by a high performance layout compared with a conventional layout |
| Line efficiency | 55–60% within a year |
| Inventory | About 50% lower through lean manufacturing tools |
| Cut-to-ship ratio | 99% for standard products |
| Changeover | Quick, for flexibility in product mix |
| Cost | Maximum use of low cost automates and work-aids |
| Information | An MIS that captures the right data for decisions |
| Compliance | Fully compliant with Safety, Health and Environmental norms |
Engagements
Start-up assistance builds the factory from scratch on a turnkey basis.
Re-engineering brings an existing factory closer to the Engineered Factory.
Tailored modules cover one area at a time.
An apparel factory with trained manpower, optimum technology, ideal infrastructure and rationally designed processes, designed together as one system.
Individual operators reach up to 40% efficiency within 6 weeks of training, and lines reach 55 to 60% within a year.
Factories from 150 to 6,000 machines, in India, Bangladesh, Vietnam and Ethiopia.
Yes. Re-engineering brings an existing factory closer to the Engineered Factory, and tailored modules cover one area at a time.